#8 Lockout-tagout, permitting

Online maintenance requires to properly prepare and execute equipment isolation :
● Lock-Out Tag-Out (LOTO) procedures need a detailed understanding of layout & systems operation
● Preparation and distribution of LOTO checklists is time consuming and hard to optimise
● LOTO is tightly linked to work permits, yet this dependency is often loosely managed
With Samp, master the core processes of maintenance.

More to explore

Webinar: Automated Spatial Tagging

Discover how Shared Reality helps you visually isolate piping circuits and corrosion loops instantly, bridging the gap between engineering data and field execution.

A Reality-Based Evolution for RBI and Process Safety Management

In brownfield refining, petrochemical, chemical, and offshore processing facilities, maintaining dedicated “inspection isometrics” represents one of the most resource-draining, error-prone overheads in Asset Integrity Management (AIM). For decades, plant operators have treated 2D Computer-Aided Design (CAD) piping isometric drawings as the mandatory medium for mapping Condition Monitoring Locations (CMLs), defining corrosion loops, and executing Risk-Based Inspection (RBI) workflows under API 570 and API 580/581.

Scroll to Top
Logo Samp