Use Cases

Use case video series: Understanding the reality of the field

#1 Understanding the reality of the field

Before even starting a project, there's the tedious task of collecting a lot of data about the site.
All this data is viewed through different solutions, making it difficult to understand the full context.
Find out how Shared Reality helps you better understand and share with all your teams, partners & contractors.
Use case video series: Reviewing consistency across all dimensions

#2 Reviewing consistency across all dimensions

Samp's AI helps you generate or check your equipment inventories (1D) or technical diagrams (2D) based on your site reality capture (3D).
With the Shared Reality workspace, YOU are in control, and can rapidly validate then share critical technical information with all teams.
When starting a new contract, preparing a rehabilitation, a handover, or a one-of-a-kind maintenance, perform faster and safer with Samp.
Designing, Modeling, Remodeling

#3 Designing, Modeling, Remodeling

Many project owners mandating BIM ask to remodel everything with 3D CAD. This is long, costly and risky.
Most of the time, this does not even meet real needs, and covers areas that will be untouched or demolished.
Minimize remodeling: use your reality capture directly !
With Shared Reality, you can interact, filter, tag, export, import, straight from your reality capture, WITHOUT any 3D CAD, with as many users as you want.
Use case video series: Multidisciplinary synthesis, reconciliation

#4 Multidisciplinary synthesis, reconciliation

As rehabilitation, revamping or expansion projects are prepared and executed, it is key to ensure that all teams can collaborates around a Shared Reality.Not all disciplines work the same way:
● Asset managers work with asset lists
● Mechanical & electrical teams use single line diagrams
● Field workers know their site from on-the-spot experience
This is why Shared Reality is a hybrid workspace combining all three dimensions: 1D equipment lists, 2D diagrams, 3D reality capture.
All teams speak the same language in just days !
startup

#5 Tests, commissioning and startup

With Samp, test at the crossroads of geospatial & systems
Preparing, sharing and executing field tests requires a simultaneous understanding of geospatial and systems constraints
Shared Reality offers a dual view of the site and the systems
Prepare and share punch lists, where each step is visually associated with an equipment or a location in space (e.g. welds).
When performing tests, know what is upstream and downstream, not just visually, but also in the system's logical diagrams.
Handing over data and responsibility

#6 Handing over data and responsibility

At the end of a critical project, handing over asset data to the site operator is always challenging :
● The new site configuration is not know by the operators
● The skills are different between the project & operations teams
● A lot of information needs to shift from the BIM Common Data Environment (#CDE) to the operator's Asset Management Systems (#EAM) or Computerized Maintenance Management System (#cmms)
With Samp: end the nightmare of project handover
Training, onboarding and leveraging experience

#7 Training, onboarding and leveraging experience

Industrial sites last longer than employees' careers:
● A generational change is ongoing, and turnover is now higher at many sites
● Outsourcing has become the norm, more teams are unfamiliar with the sites
● After a retrofit, or a move to another site, teams must grasp the changes, fast
With Samp, leverage your most valuable capital: human capital
Newcomer rapidly grasp the site layout, while understanding the various systems, thanks to the unique view offered by hashtag#SharedReality.
Experienced and senior employees contribute to knowledge capitalization in the same workspace, which benefits all teams and contractors.
Lockout-tagout, permitting

#8 Lockout-tagout, permitting

Online maintenance requires to properly prepare and execute equipment isolation :
● Lock-Out Tag-Out (LOTO) procedures need a detailed understanding of layout & systems operation
● Preparation and distribution of LOTO checklists is time consuming and hard to optimise
● LOTO is tightly linked to work permits, yet this dependency is often loosely managed
With Samp, master the core processes of maintenance.
Risk-based asset management

#9 Risk-based asset management, investment planning

Risk-based asset management, investment planning:
● Rigorous asset management is the foundation of industrial safety and key to optimizing investment plans.
● An accurate equipment inventory is essential to retain a license to operate or certification (eg hashtag#ISO55000).
However, local upgrades carried out on an ongoing basis by staff or contractors are not always properly documented, resulting in 𝗮𝘀𝘀𝗲𝘁 𝗺𝗮𝗻𝗮𝗴𝗲𝗺𝗲𝗻𝘁 𝗱𝗿𝗶𝗳𝘁.
With Samp, regain control on your assets knowledge #SharedReality transforms the way your Risk-Based Asset Management and Asset Investment Planning workflows are executed, thanks to a visual way of working.
In just days, connect your #RBAM or #AIP systems to an interactive field-checked 3D view, for unparalleled #operationalexcellence and safety.
Scroll to Top
Logo Samp

Stéphane Evanno

Chief Strategy & Development Officer

What can you expect from a demo with Samp?

Scanning Services

Extend the reach of your scanning services by delivering your scanning campaigns on an AI-powered 3D worspace, designed from the ground up for the industry. Leverage your surveying and topographic expertise to consolidate valuable field data into a single viewer: maps, aerial and drone orthophotos, laser scans, photogrammetry or videogrammetry, and georadar can now be securely viewed, updated and shared in one place.

Engineering services, EPC

Upscale the value of your engineering services offering by delivering digital twin as a service, powered by your qualified staff. Improve customer retention with longer-term contracts that ensure continuous synchronization of technical data with the as-built facility. Accelerate or automate the production of technical deliverables when working on brownfield projects with little or no existing input information.

CONTRACT OPERATORS

When preparing a quote for operating a facility on behalf of the owner, be sure to maximize that short window of time by taking advantage of as much technical information as possible. Turn your initial site visit into a unique opportunity to capture the current condition of the facility. Make a bid that will beat the competition with an already operational digital twin, while giving you increased confidence in your future service contract margins.

OWNER OPERATORS

Whether you manage a single plant or multiple sites, whether your facilities are on-shore or off-shore, we can help you build and maintain a twin within days. Major milestones in a plant’s lifecycle, such as handover from EPC to operator, change of ownership, revamping or decommissioning, provide an opportunity to implement a safer and more efficient way of working with your extended teams, regardless of the quality of your technical data.